One box Assembly and Testing Production Line
Process:
Full-automatic feeding and assembly
Loop 1: Valve block body assembly, ball pressing, sealing assembly, solenoid valve assembly
Loop 2: ECU assembly, coil assembly, motor assembly, adjustment rod assembly, tank assembly, EOL(End-of-Line) test.
Cycle Time: 35S