Automotive Actuator
Automotive Seats
Wire-control chassis
Passive Safety
Automotive Electronic
Car Door System
Hydrogen Fuel Cells
ADAS
Multi-in-one Electric Drive System
OBC
Low-voltage products
Medium and High Voltage Products
Hydraulic Core Components
Gas Box Assembly and Testing Line
Process:
Semi-automatic assembly, cabinet cleaning, resistance welding, leakage test, HV&PD test, EOL (End of line) test, package
Cycle time:: 27Min
Medium Voltage Circuit Breaker Assembly and Testing Line
Semi-automatic assembly, curing, open distance adjustment, pre-inspection and run in, open distance fine adjustment, trolley assembly, EOL (End of line) test
Cycle time:5Min
Medium and High Voltage Vircuit Breaker Assembly and Testing Line
Semi-automatic assembly, resistance welding, leakage test, high voltage test, function test, low voltage test, laser marking, EOL (End of line) test
Cycle time:30Min