Door control ECU Assembly and Testing Production Line
Process: Tighten, ultrasonic welding, leakage test, riveting, servo pressing, visual inspection, EOL(End-of-Line) test.
Cycle Time: 12S
Door systems Assembly and Testing Production Line
Process: Tighten,press,winding ,robot loading&unloading
Latch system Assembly and Testing Production Line
Process: Feeding,laser welding,, leakage test, riveting, visual inspection, laser marking, EOL(End-of-Line) test.
Cycle Time: 9.2S
Automotive Side Door Drive System Assembly and Testing Production Line
Process: Gear box assembly, worm gear assembly, torque test, ultrasonic welding, leakage test, riveting, servo pressing, visual inspection, EOL(End-of-Line) test.
Cycle Time: 31.5S
Automotive Tailgate Drive System Assembly and Testing Production Line
Process: Ball screw lubrication, bush lubrication, riveting, ultrasonic welding, EOL test.
Cycle Time: 18S