Side Door Strut
Automotive Side Door Drive System Assembly and Testing Production Line
Process: Gear box assembly, worm gear assembly, torque test, ultrasonic welding, leakage test, riveting, servo pressing, visual inspection, EOL(End-of-Line) test.
Cycle Time: 31.5S